Gas scheduled to LNG export terminals, on 12 pipelines
lng-feedgas
Unit: million MMBtu a day · Daily · Since 15 Jul 2026
How much gas the pipelines have scheduled to the points that feed US LNG export terminals, in million MMBtu a day.
- Covers
- Eight LNG export terminals on the Gulf Coast and in Georgia, as fed by 12 interstate pipelines. Gas that reaches them on other pipelines, and terminals elsewhere, are not counted. Scheduled, not metered.
- Method
- The pipeline operators' scheduled quantities at the points that feed the terminals, added up for each gas day (9 a.m. to 9 a.m. Central) at the latest scheduling cycle. A point that hands gas to another of the 12 pipelines on its way to a terminal is left out, so the same gas is not counted twice. A day is given only when all 12 pipelines' figures for it are in, and the newest days can change as later cycles come in.